Request a Call
  • Handover Conditions
  • Payment Terms
  • Apartments will be handed over in December 2027 in Green Frame condition, which includes:

    • High-quality metal-plastic doors and windows;
    • Premium-quality locally manufactured steel entrance door with thermal and sound insulation;
    • Internal partitions and prepared walls;
    • Screeded floors and concrete ceilings;
    • Balconies finished with porcelain tiles;
    • Connected utilities, including electricity, water, sewage, and natural gas;
    • Pre-installed network infrastructure for internet and television;
    • Installed electrical points;
    • Modern access control system.
  • An apartment at Bilderz Isani can be purchased with flexible payment terms — with a 20% initial down payment, while the remaining amount can be paid according to an individually tailored payment schedule until December 2027.

    The apartment can also be purchased through a one-time payment or with a mortgage loan from our partner, Basis Bank.

  • Handover Conditions
  • Payment Terms

Bilderz Isani

Bilderz Isani is a new residential complex under construction on Nadirashvili Street, near Isani Boulevard. It combines distinctive architecture, thoughtfully designed infrastructure, and spaces created for everyday comfort.

Along with residential apartments, the project includes an underground parking facility for 39 vehicles and commercial space. The complex also features a 1,000 sq.m landscaped courtyard, with dedicated areas planned for children’s activities and relaxation.

To ensure safety, the building will be equipped with modern systems, including fire alarm systems, a water reservoir, internal and external fire hydrants, and a generator that will ensure the uninterrupted operation of elevators and parking facilities in case of power outages.

Bilderz Isani is located near the Mtkvari River embankment, in one of the city’s rapidly developing and promising districts. Its convenient location creates a comfortable living environment and enhances the project’s investment appeal.

Construction is actively underway, with completion scheduled for December 2027.



Select an Apartment

ADVANTAGES

  • Convenient Location;
  • Landscaped Courtyard and Recreation Areas;
  • Underground Parking Facility for 39 Vehicles;
  • Modern Security Systems;
  • Energy Efficiency;
  • Reliable and Financially Stable Developer.

Specifications